• Home/Contact
  • January & February 2026
  • Front Deck & Windows
  • Side Panels - Bow Section
  • Furniture Fitout
  • Front Bridgedeck
  • Bulkheads
  • Cabin Top
  • Bridgedeck
  • Second Hull
  • The First Hull
  • First Hull Continued
  • Tender - Covid Project
  • Shed, Supplies & Frame
  • More
    • Home/Contact
    • January & February 2026
    • Front Deck & Windows
    • Side Panels - Bow Section
    • Furniture Fitout
    • Front Bridgedeck
    • Bulkheads
    • Cabin Top
    • Bridgedeck
    • Second Hull
    • The First Hull
    • First Hull Continued
    • Tender - Covid Project
    • Shed, Supplies & Frame
  • Home/Contact
  • January & February 2026
  • Front Deck & Windows
  • Side Panels - Bow Section
  • Furniture Fitout
  • Front Bridgedeck
  • Bulkheads
  • Cabin Top
  • Bridgedeck
  • Second Hull
  • The First Hull
  • First Hull Continued
  • Tender - Covid Project
  • Shed, Supplies & Frame

50ft Chamberlin Catamaran Build

50ft Chamberlin Catamaran Build50ft Chamberlin Catamaran Build50ft Chamberlin Catamaran Build

January & February 2026


2/1/2026 -  Routed edges in the kitchen and helm areas.  Measured up and cut fibreglass.  Filled the routed edged with thickened epoxy. Rounded off the top of the raised edges.

4/1/2026 - More Routing and sanding in the kitchen and helm areas.  Trev worked on the Nav Table Lid and the compartments inside.  Me - Failed attempt at making sour dough - more like house brick.  Cut more fibreglass.  

Filled routed areas with thickened epoxy. Glued Top on the Settee Seat section near the steering station and the straight piece on the floor to join the curve section.

5/1/2026 - Sanded and made compartments in the nav table and the shelves for the nav table lid to close onto.  Glued those in place. Cut more fibreglass.

6/1/2026 - Sanded and prepped to fibreglass everything on the port side that needed to be fibreglassed.  Set up cooler and fans galore to help cool it a bit.

Fibreglassed the overhead areas in the engine room, bathroom area, step area, where the inverter will go and the queen bed area.

7/1/2026 - Pulled peel ply and sanded all the edges and rough bits.  Organised all the cut fibreglass into piles ready for tomorrows big day fibreglassing.

8/1/2026 - Up early before it got too hot and fibreglassed the navigation and helm area, kitchen cupboards and stove area.

9/1/2026 - Up early again not as organised as yesterday but we fibreglassed the overhead areas in the king single, behind where the stove goes and the queen bed area on the starboard side.

11/1/2026 - Pulled peel ply, Sanded everything that needed sanding.  Routed out the front of the helm seat, glued in chart table top and the end of the seat. Filled the routed edge with thickened epoxy.  Cleaned up everything and then started playing with the laser on the drive shaft location.  One keel was a little shorter at the prop.

13/1/2026 - Bored a few holes for conduit.  Prepped mullions for the doorway.        A lot of working things out day.  eg where extra conduits are required for the motor to lift the tender; to the microwave and through to the queen beds; 12v to the nav station chargers;  working out the height we need the steering station seats at and how we can achieve that - need a 70mm high slider under them.

Checked vents for refrigeration area and marked out where to cut openings.  Glued 15mm scrap pieces of foam together to make the floor for the fridge area.

14/1/2026 - Had another failed sour dough but the one I cooked this morning wasn't too bad.  Still trying to work out how others can make theirs rise higher and they are softer.

15/1/2026 to 23/1/2026 - In Brisbane grandchildren sitting.  

24/1/2026 to 27/1/2026 - came home to our other grandchildren visiting while they had an open house day or two to sell their house.  There was an offer made that weekend.

29/1/2026 - Last day of working - Tomorrow we will be officially retired or tired.

30/1/2026 - Thickened epoxy filled the edges of the fridge/freezer area that Trev routed out at some point. 😅 Not sure when.

1/2/2026 - Sanding around the fridge/freezer areas and did a bit of routing.  We unloaded insulation out of the trailer and stored under the house.  A job for another day is to put it up.

2/2/2026 - Cut fibreglass and then fibreglassed the Nav area, the kitchen, nav floor; inside the fridge freezer - top, sides and floor and one piece in the king single that we missed previously.

3/2/2026 - Peeled off peel ply. Trev planned to paint but the plans changed to cleaning out the ceiling instead.  All those stored tax return papers for probably 15 years.  Ha - applied for a fire permit thinking to burn it all - got the permit and spent 2 hours feeding in single pages so that they would burn or clump that you had to keep stirring.  In the end order two of the bins locally to get them shredded.

Got the ceiling all cleaned out so we can store some of our things as the son that has sold his house and his family are moving in for 9-12 months.  

4/2/2026 - Trev glued in the back of the inverter cupboard.  A fair bit now is just Trev working while I rearrange the house and put things away or boxed up and stored or given away.

6/2/2026 - Measured up for the eaves on the boat. Cut angle ready to glued and screw in place.  Cut some of the eaves and glued up some of the angle.  We both got up and worked out where we would put the drain hole for the roof and how we would plumb that so that it could go overboard or fill up the water tanks.

8/2/2026 - Trev sanded ready to put up eaves.  We glued them up and screwed them in place.  Drilled two holes in the single beds for the round vents.  He screwed up two vents underneath the bridgedeck where the chain locker is.  Looks a bit like dogs balls.🤭  Not sure if we stick with those or something a little more slim lined. 

9/2/2026 - Cut uni for Bulkhead 5 inside and out

Cut angle for the eaves.  Put structural bog on the starboard keel 5-10mm to make up the difference from port to starboard side.

LOOKED AND WONDERED then did a  bit more looking and wondering. Working things out in his head how we will go about doing things.  Cut out 4 more pieces of angle for the eaves.  A bit fiddly.

10/2/2026 - Sanded starboard keel. Cut vent holes in eaves, routed and filled the edges.

11/2/2026 - Sanded eaves,  Sanded the port side nose of the boat to round it off a bit.  Sanded vent holes and had a bit of a tidy up in the shed.

12/2/2026 - A day in the house cleaning ceilings and windows, etc ready for the kids to move in.

13/2/2026 - Cut out pieces for the cockpit windows to make them higher to allow for the seat back rests.  Glued those in.

15/2/2026 to 18/2/2026 - Bored holes through the keel at 2 deg for the propellor shaft etc.  The starboard side was fairly easy going but ended up being 1.5 degrees which meant we had to elongated the holes. No problem.

The port side proved to be a bit more difficult to get through.  Got stuck at BHD 7/7.5 not sure which but there was a lot of fibreglass in that section.  Eventually got it with a slightly larger hole cutting piece.  Where the holes went through the bulkheads Trev routed out the foam and filled with thickened epoxy.

More fibreglass cut to do the settee ends and the back of the inverter wall on the nav station side.

19/2/2026 -BHD 5 - Fibreglassed the inside corners with Uni, the last of our carbon fibre uni and with 400/600 double bias.  Fibreglassed inside the fishing rod areas.

ORDERED MOTORS TODAY.

20/2/2026 - WENT FISHING.  🎣  6 Flathead & 1 Whiting.  Trev was the winner - 5 Flathead.

22/2/2026 to 26/2/2026 - Helping family with the move.

27/2/2026 to 28/2/2026 - Catching up on sleep and laundry and mowing.


See what March brings.



Copyright © 2026 50ft Chamberlin Catamaran Build - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept