14/6/2026 - Started Drawing out the fuel and water tank floors on 20mm fibreglassed foam.
15/6/2026 - cut out the floors for fuel tanks.
18/6/2026 - Cut out Baffles for fuel tanks using thin plywood. Cut sections in the floor pieces for the well. (lower area for fuel to flow to for the pickup.
Made well, glued and clamped pieces together.
19/6/2026 - Day trip to ATL to pick up last drum of resin and the last of foam required for flooring and furniture plus flow coat.
21/6/2026 - Sanded all in the fuel and water tank areas. Painted in the bottom of the fuel tanks, below floor level. Painted the underside of the floor pieces. Fibreglassed part of the well pieces and fibreglassed both sides of the baffles for the fuel tanks.
22/6/2026 - Went fishing 🎣 and only caught Bass that are in breeding season. Released back. No flathead.
23/6/2026 - Glued in the wells and the floors for the fuel tanks. Trimmed down baffle edges to fit tanks again, after fibreglassing.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.